Chestnut Walk
- mike
- Aug 22, 2019
- 1 min read
Following a successful funding application to Awards For All. The path development, work is now well underway..


Due to very poor drainage and problems with existing land drains, the first job was to install a new land drain along the length of the path, and repair some of the existing drains.
This has been a difficult job and we apologize for any inconvenience caused during the development.

With so much material to be moved a dumper truck was hired this week, and volunteers turned out every day to complete the drainage work and get the path base installed.
Many thanks to all who turned out, there's still a lot of work to do but most of the hard labor is over!